DRAG DROP
A company has several applications that are being moved to a Horizon environment. An architect has
been given several application types and is designing an environment to accommodate all of the
applications.
List of applications:
WebSeller a cloud-based application that is single sign-on capable.
RoloContact a Windows application that utilizes an Internet Explorer 6 and an IE plugin, but
needs to be deployed to Windows 8 desktops.
AppOffice a group of Windows based application that needs to be deployed together to an
existing View linked clone desktop pool for the remote sales team.
RelationCRM a server-based application that is currently accessed via RDP.
Match each application with its appropriate deployment method.
DRAG DROP
A customer has an aging storage array that must be replaced. The array is used by VMware hosts in
their data center. The storage array is under warranty, but the hosts are all out of warranty. The
customer wants new hardware running Horizon 7, and is open to a hyperconverged solution. The
project must take place with minimal-to-no disruption during normal business hours. The CIO states
there is a maximum budget of $600, 000 for the project. The IT Director says their UPS units were
replaced last year and they dont need to be updated. The existing racks are heavily populated, with
limited rack units remaining and no additional datacenter floorspace for another rack.
Match the statements taken from the scenario with its correct design category.
The IT team for a small government organization wants to deploy Horizon Apps.
It needs to provide Windows desktops to two groups of users.
Most users only need a few Windows applications.
It wants to minimize storage space required.
It determined that they need 4 RDS Hosts, but more will be needed in the next 6 to 8 weeks.
It installed and configured RDS on a Windows server VM, installed the Horizon Agent, and then the
Windows applications.
What steps must the organization perform next to create a scalable and flexible Horizon Apps
deployment?
B
A security team is implementing VMware Identity Manager to have a central point for authentication
to facilitate access to its companys applications. The team would like to have users to authenticate
to VMware Identity Manager before being able to connect to a Horizon View Desktop.
What can be done to ensure that users who try to authenticate to the Horizon View Connection
brokers are forced to first authenticate to VMware Identity Manager?
D
A customer is struggling with how to support application delivery to its highly mobile sales force.
There are two Windows applications that need to be delivered, which could present a challenge.
Both applications use a local copy of the central database and the applications are frequently being
updated.
During assessments and user interviews, the sales personnel indicated that they frequently use
these two applications while traveling in areas with poor connectivity. The sales people rarely
connect to the company network. Pushing out updates using a traditional deployment system is
therefore difficult.
Which solution from VMware would solve the customers situation?
D
The CIO of a company has asked that a review of all users applications be undertaken to improve
storage usage. After the review, it was found that a number of applications are used by several
different organizations within the company. These applications are currently all installed in all of the
different master images, making each of the master images very large.
What VMware technology would improve storage usage?
C
A customer is deploying Horizon View 7.1 utilizing a Cloud Prod Architecture. The customer wants to
utilize 32-node clusters, and a single vCenter at each site to support 9,500 desktops per site.
Which two statements about this configuration are true? (Choose two.)
B, D
A customer has chosen vRealize Operations Manager for Horizon as its monitoring solution.
The customers requirements are:
Monitor the PCoIP metrics to address user experience complaints.
Minimum required resources should be used for monitoring purposes.
Recent project updates include:
vRealize Operations Manager is already in use for vSphere monitoring.
All desktop templates are created with Horizon 7 View agent and Horizon deployment is at the final
stage of completion.
Existing vRealize Operations Manager capacity is already scaled out to meet the current
requirements of Horizon 7 monitoring needs.
Which two additional components are required to make the monitoring systems ready? (Choose
two.)
B, E
A company is implementing VMware Horizon View 7 solution. It has created four 500 linked-clone
desktop pools to be used by different departments and workers. The companys VDI administrator
noticed that Horizon View Composer is showing in error state on the View Admin Web Console.
During restart of the Composer service, the service failed to start up again. A decision was made to
migrate View Composer to a new server and preserve the linked-clone information.
What three steps are requires for the migration? (Choose three.)
C, D, E
Explanation:
https://docs.vmware.com/en/VMware-Horizon-7/7.5/horizon-administration/GUID-F84681E3-4CA7-402D-959C-610F5E07FBB0.html
A company is deploying VDI and needs to meet these requirements:
Support a bring-your-own-device (BYOD) strategy
Support external contractors
Support access from anywhere
Reduce or eliminate costly desktop and laptop replacement
Which two solutions should an architect recommend? (Choose two.)
A, C