Question 1

A ___________ is used primarily to track the stability of the average value of a metric of interest.

  • A. NP Chart
  • B. Xbar-R Chart
  • C. I-MR Chart
  • D. C Chart
Answer:

B

Discussions

Question 2

For her injection molding project a Belt needed to track the percentage of defectives of a particular
sample set so she used a ___________ to display the data?

  • A. Individual Chart
  • B. C Chart
  • C. Xbar Chart
  • D. P Chart
Answer:

D

Discussions

Question 3

Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the
process?

  • A. Xbar Chart
  • B. Time Series Chart
  • C. Neither
  • D. Both
Answer:

A

Discussions

Question 4

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause
variation the Control Charts use which of these?

  • A. Data shift analysis
  • B. Outlier analysis methods
  • C. Center Line and Control Limits
  • D. None of the above
Answer:

C

Discussions

Question 5

Common and ______________ Cause Variation are the focus of Statistical Process Control.

  • A. Uncommon
  • B. Ordinary
  • C. Special
  • D. Selective
Answer:

C

Discussions

Question 6

Special Cause Variation falls into which two categories?

  • A. Natural & Unnatural
  • B. Short Term & Long Term
  • C. Assignable & Pattern
  • D. Attribute & Discreet
Answer:

C

Discussions

Question 7

Range Charts are the technique used to determine if Special Causes are occurring within the
subgroups of the ______________.

  • A. Histograms
  • B. SPC Charts
  • C. NP Charts
  • D. Pareto Charts
Answer:

B

Discussions

Question 8

If the production is for higher volume and monitoring and the Mean and variability is to be
monitored for four machines producing product and the characteristic to be monitored is Variable
Data, which SPC Chart is best to be selected?

  • A. Xbar-R Chart
  • B. Individual-MR Chart
  • C. NP Chart
  • D. CUSUM Chart
Answer:

A

Discussions

Question 9

When a Belt Poka-Yokes a defect out of the process entirely then she should track the activity with a
robust SPC system on the characteristic of interest in the defect as an early warning system.

  • A. True
  • B. False
Answer:

B

Discussions

Question 10

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a
_____________ so those involved in the process know what to do when the critical metrics move
out of spec.

  • A. Response Plan
  • B. Call List
  • C. Chain-of-Command
  • D. Defect Analysis Plan
Answer:

A

Discussions